Project References
Dynamic tests in a nozzle
Dynamic design of the world’s largest nozzle (6 m diameter) for the trailing suction hopper dredger “Cristobal Colón” for Jan de Nüll, for CONSTRUCCIONES NAVALES DEL NORTE-LA NAVAL.
cript src="https://kit.fontawesome.com/5799a1f17a.js" crossorigin="anonymous">
TSI completes the SOST-INT Project under the PERTE Naval programme, delivering advanced structural health monitoring systems, condition-based maintenance (CBM) strategies and FEM structural models for ships.
TECMANT and TSI forge a strategic alliance to enhance predictive maintenance, vibration analysis, and industrial diagnostics for naval and industrial sectors.
Merry Christmas to all! Closing 2025 at TSI: thank you for your trust. We look forward to 2026 with new engineering challenges and technical excellence. Happy Holidays!