cript src="https://kit.fontawesome.com/5799a1f17a.js" crossorigin="anonymous">
Avda. Pio XII, 44 · Torre 2 - Madrid, (Spain) +34913459730 infotsi@tsisl.es

Objectives:Operation and Maintenance costs reduction, implementing from scratch and in no more than six (6) months a comprehensive CBM program or assessing the existing one. The following activities will be carried out:

  • Mentoring and training in how to analyse and identify critical maintenance issues before typical failures occur by means of vibration measurement, analysis and control. Spectrum and vibration analysis training.
  • Definition of the main stages of a CBM Project. Turbo-compressor failures.
  • Real Practical Cases of Diagnosis and Resolution. Attention to Fault Cases presented by attendees. Continuous Monitoring/Protection of vessels’ critical equipment.
  • Identification and correction of complex failures.

Aimed at:Maintenance Technicians, Plant Managers, Engineering Department, Projects, Management, Department Managers, Quality Control; of Co-generation and Combined Cycle plants. It is not essential to have prior knowledge of this methodology and its tools. Have prior knowledge of this methodology and its tools. No previous knowledge or experience is needed. Have prior knowledge of this methodology and its tools.